Reply within one working day You speak to a consultant, not an account manager No discovery fee, no sales deck +91 98998 68981 WhatsApp
OMAV TECHNOLOGY
Cloud & Infrastructure

Backup and Disaster Recovery

Backup and disaster recovery work produces a recovery plan that has actually been restored from, and dated. An untested backup is a belief, and beliefs do not restore databases.

At a glance
Covers
RPO and RTO definition, backup implementation, restore testing, DR rehearsal
Defining test
A dated, successful restore
Ransomware position
Immutable or offline copies, credential separation
Rehearsal cadence
At least annually, with findings recorded
Typical duration
4 to 10 weeks, then rolling
Provider
OMAV Technology Private Limited
Backup and Disaster Recovery

A plan you have actually executed

Almost every organisation has backups. A much smaller number have restored from them recently, and a smaller number still have restored under the conditions a real incident would impose — the primary environment unavailable, the usual administrator unreachable, and the credentials for the backup system stored in the system that is down.

So the work divides into two halves. The first is unremarkable: agree RPO and RTO per system in business terms, implement backups that meet them, hold immutable or offline copies. The second is what distinguishes it: restore, on a schedule, and record the date and the result.

Where a test fails, that is the finding. It gets written down rather than quietly repeated until it passes, because the pattern of failures is more informative than the eventual success.

Scope

What the engagement covers

Six workstreams. The fourth is the one that makes the rest real.

RPO and RTO per system

How much data loss and how much downtime is acceptable, agreed in business terms with the people who bear the consequence rather than assumed by IT.

Backup implementation

Coverage across systems, databases and configuration, with immutable or offline copies so that an attacker with administrative access cannot delete the recovery position.

Credential separation

Backup system credentials held separately from the primary identity domain, because a recovery plan that requires logging into the compromised domain is not a recovery plan.

Restore testing

Restores executed on a schedule agreed with you, each one dated with its result recorded — including the failures, which are the findings.

Recovery runbooks

Documented procedures per scenario, written for whoever is available at the time rather than for the person who designed the system.

DR rehearsal

A failover exercise at least annually, run against the assumption that the primary environment and its usual administrator are both unavailable.

Method

How the engagement runs

Agree targets

RPO and RTO defined per system with business owners, so that recovery expectations are stated rather than inferred after an incident.

You get: Agreed RPO and RTO

Assess coverage

Current backups checked against those targets, with gaps quantified — including systems nobody realised were unprotected.

You get: A quantified gap list

Implement

Coverage completed, immutable or offline copies established, and backup credentials separated from the primary domain.

You get: Protected, separated backups

Test restores

Restores performed and dated, failures recorded as findings, and runbooks corrected wherever the test diverged from the document.

You get: Dated restore evidence

Rehearse and review

An annual failover rehearsal under realistic constraints, with findings written down and the plan updated.

You get: A rehearsed DR plan
Comparison

Recovery positions compared

What each protects against, and what it does not.

PositionProtects againstDoes not protect againstTypical RTO
On-site backup onlyHardware failure, deletionSite loss, ransomwareHours
Off-site copySite lossRansomware with admin accessHours to a day
Immutable or offline copyRansomware, malicious deletionSlow-burn corruptionHours to a day
Warm standbySite loss, extended outageData corruption replicated acrossUnder an hour
Tested plan with runbooksHuman error under pressureNothing on its ownDepends on the above
Limits

What we will not sign off

We will not describe a backup position as a recovery plan until a restore has been performed. Configuration that reports success is not evidence; a dated restore is. Where a client wants the documentation without the testing, we will produce the documentation and state clearly on it that the plan is unverified.

Replication also is not backup. Synchronous replication protects against losing a site and faithfully replicates corruption and malicious deletion to the second site within seconds. Where a business case rests on replication alone, that gap needs stating before an incident rather than after.

Key points
  • An untested backup is a belief. A dated restore is evidence.
  • Hold backup credentials outside the primary identity domain.
  • Replication protects against site loss, not against corruption or ransomware.
  • A failed restore test is the finding; record it rather than quietly retrying.
FAQ

Questions buyers ask about this

How often do you test restores?

On a schedule agreed with you, typically quarterly for critical systems and annually for the rest. Every test is dated with its result recorded. If a test fails, that is the finding — it is written down rather than repeated quietly until it passes, because the failure pattern tells you more than the eventual success.

What about ransomware specifically?

Immutable or offline copies so that administrative access cannot delete the recovery position, credential separation so the backup system is not reachable from the compromised domain, and a recovery rehearsal that assumes the primary identity domain is unavailable. Most recovery plans fail that last assumption.

Is replication the same as backup?

No. Replication protects against losing a site and will faithfully copy corruption or malicious deletion to the second site within seconds. Both have a place; treating replication as a backup is one of the more common and more expensive misunderstandings in this area.

How do you set RPO and RTO?

With the business owners of each system, in terms of acceptable data loss and acceptable downtime, because those are commercial judgements rather than technical ones. IT can state what each target costs to achieve; only the business can say what the outage costs.

What does a DR rehearsal involve?

A failover exercise run under realistic constraints — the primary environment unavailable and the usual administrator not participating — with the runbook followed as written. Every point where the runbook proves inadequate is a finding, and correcting those is the actual output of the exercise.

Marked up as FAQPage structured data, matching the visible text exactly.

Still not sure this is the right service?

Answer four questions and we will tell you which one fits — or that none of them do.

Get in touch

Tell us what you are trying to fix.

A short conversation about the objective, the constraints and the timing. If we are not the right fit, we will say so.

sales@omavtech.com +91 98998 68981